Readiness & recognition
The HTDC H-IRL framework is an internal ten-level scale that describes a healthcare project's development stage and identifies potential gaps. It is not a universal global certification standard.
HTDC H-IRL / levels 1–10
Each level describes project preparation. H-IRL is not a guarantee of financing, regulatory approval or operational readiness.
01–03 Early stage
04–06 Developing
07–08 Advanced development
09–10 Investment preparation
01
An initial opportunity, concept or site is identified. Project details remain limited.
02
Site, location or development rights start to be understood and documented.
03
Service type, target community and possible licensing pathway are identified.
04
Principal legal, technical and location constraints are screened.
05
Demand, preliminary design, cost and possible income are investigated.
06
Business assumptions, operating concepts and scenario-based financial modeling emerge.
07
Core land rights, licensing pathway and technical feasibility become more defensible.
08
Capital requirements, transaction options and advanced plans are clearer.
09
Material documents, stage-appropriate permits, risk allocation and transaction information are documented.
10
Comprehensive documents can support formal investor appraisal and negotiation, without guaranteeing capital.
Level descriptions are illustrative. A project's level is confirmed only through the assessment process described below.
Two assessment modes
Registration and formal document-based assessment are separate processes.
01 / Preliminary
An initial indication based on information submitted by the project owner. A complete investment dossier is not needed for basic registration.
Self-reported information
02 / Document-based
A review of available project documents and evidence, resulting in a revised level and a formal report within an agreed scope.
Documentation reviewed
HTDC
ASSESSED
Project readiness
Illustrative recognition mark. Not an issued certificate.
HTDC Assessed
Projects that complete a documented readiness assessment may qualify for HTDC Assessed recognition, which states the assessment date, the assigned H-IRL level and the scope of material reviewed.
✓ Defined documentation scope
✓ Assessment reference and date
✓ Assigned H-IRL level
✓ Clear distinction between assessed and unassessed information
Recognition does not certify all technical, financial and legal information. It does not confirm permits or guarantee investment returns or financing.
Project status
The formal status is separate from any strategic selection or promotional priority.
01
Initial information received.
02
Materials pending review.
03
Document-based readiness review completed within scope.
04
Additional specified verification completed.